You know the gap between today's estimate and the tender threshold, and what to fix first.
Before you start
A workspace that is set up
Imported or synced records
Tender figures if you are bidding
01
Check the scope
Overview is the first page. Check the entity, financial period and ICV programme at the top. Never compare scores from different entities or periods.
02
Read the score strip
The strip shows the ICV score estimate, Planned improvement and Tender threshold. The row below compares the score on your certificate, today's estimate, and the score after the plan.
Open Tender details and select Edit tender. Enter the tender name, contract value, gross margin, decision date and tender threshold, then select Save tender. Auditro shows the estimated gross profit that depends on reaching the threshold.
04
Work through what needs attention
The readiness track and the attention panel list what stops the score from being reliable, such as missing records, evidence waiting for review, or inputs nobody has confirmed. Each item links to the screen where you fix it.
05
Check the basis
Select How this is calculated to open the side sheet. It shows how each component was calculated, which ruleset version applied, and which records it used, with Point estimate approval and Period status.
06
Plan the gap
If the estimate is below the threshold, select Plan in the sidebar and propose a plan to close the gap.
Completion check
You know the gap between today's estimate and the tender threshold, and what to fix first.
If you do not see this result, check the previous step, reporting period, and your access level.
Ask AI about this guide
Use this public page as context in ChatGPT or Claude. This does not connect to your private Auditro workspace.
The prompt uses this public page. Check it before sending.
Explain this Auditro guide in plain language. Keep the product labels exactly as written. Then give me a short checklist.
This public guide prompt does not connect to private records.
Use only the documentation below. Do not invent controls or workflow states, give certification advice, or promise a score or tender outcome. If the guide does not answer something, tell me to contact Auditro support. Do not ask for credentials or company records.
Guide: Read the score on Overview
Role: Finance lead
Outcome: You know the gap between today's estimate and the tender threshold, and what to fix first.
Before starting:
- A workspace that is set up
- Imported or synced records
- Tender figures if you are bidding
Steps:
1. Check the scope
Overview is the first page. Check the entity, financial period and ICV programme at the top. Never compare scores from different entities or periods.
2. Read the score strip
The strip shows the ICV score estimate, Planned improvement and Tender threshold. The row below compares the score on your certificate, today's estimate, and the score after the plan.
Boundary: Every figure is an estimate calculated by Auditro's rules. It is not a certified score. Only a certifying body approved by MoIAT can issue an ICV certificate.
3. Enter the tender details
Open Tender details and select Edit tender. Enter the tender name, contract value, gross margin, decision date and tender threshold, then select Save tender. Auditro shows the estimated gross profit that depends on reaching the threshold.
4. Work through what needs attention
The readiness track and the attention panel list what stops the score from being reliable, such as missing records, evidence waiting for review, or inputs nobody has confirmed. Each item links to the screen where you fix it.
5. Check the basis
Select How this is calculated to open the side sheet. It shows how each component was calculated, which ruleset version applied, and which records it used, with Point estimate approval and Period status.
6. Plan the gap
If the estimate is below the threshold, select Plan in the sidebar and propose a plan to close the gap.
Source: https://auditro.co/docs/read-score/Explain this Auditro guide in plain language. Keep the product labels exactly as written. Point out common mistakes, then give me a short checklist.
This public guide prompt does not connect to private records.
Use only the documentation below. Do not invent controls or workflow states, give certification advice, or promise a score or tender outcome. If the guide does not answer something, tell me to contact Auditro support. Do not ask for credentials or company records.
Guide: Read the score on Overview
Role: Finance lead
Outcome: You know the gap between today's estimate and the tender threshold, and what to fix first.
Before starting:
- A workspace that is set up
- Imported or synced records
- Tender figures if you are bidding
Steps:
1. Check the scope
Overview is the first page. Check the entity, financial period and ICV programme at the top. Never compare scores from different entities or periods.
2. Read the score strip
The strip shows the ICV score estimate, Planned improvement and Tender threshold. The row below compares the score on your certificate, today's estimate, and the score after the plan.
Boundary: Every figure is an estimate calculated by Auditro's rules. It is not a certified score. Only a certifying body approved by MoIAT can issue an ICV certificate.
3. Enter the tender details
Open Tender details and select Edit tender. Enter the tender name, contract value, gross margin, decision date and tender threshold, then select Save tender. Auditro shows the estimated gross profit that depends on reaching the threshold.
4. Work through what needs attention
The readiness track and the attention panel list what stops the score from being reliable, such as missing records, evidence waiting for review, or inputs nobody has confirmed. Each item links to the screen where you fix it.
5. Check the basis
Select How this is calculated to open the side sheet. It shows how each component was calculated, which ruleset version applied, and which records it used, with Point estimate approval and Period status.
6. Plan the gap
If the estimate is below the threshold, select Plan in the sidebar and propose a plan to close the gap.
Source: https://auditro.co/docs/read-score/Explain this Auditro guide in plain language. Keep the product labels exactly as written. List the prerequisites, decisions, and common mistakes, then give me a short checklist.
This public guide prompt does not connect to private records.
Use only the documentation below. Do not invent controls or workflow states, give certification advice, or promise a score or tender outcome. If the guide does not answer something, tell me to contact Auditro support. Do not ask for credentials or company records.
Guide: Read the score on Overview
Role: Finance lead
Outcome: You know the gap between today's estimate and the tender threshold, and what to fix first.
Before starting:
- A workspace that is set up
- Imported or synced records
- Tender figures if you are bidding
Steps:
1. Check the scope
Overview is the first page. Check the entity, financial period and ICV programme at the top. Never compare scores from different entities or periods.
2. Read the score strip
The strip shows the ICV score estimate, Planned improvement and Tender threshold. The row below compares the score on your certificate, today's estimate, and the score after the plan.
Boundary: Every figure is an estimate calculated by Auditro's rules. It is not a certified score. Only a certifying body approved by MoIAT can issue an ICV certificate.
3. Enter the tender details
Open Tender details and select Edit tender. Enter the tender name, contract value, gross margin, decision date and tender threshold, then select Save tender. Auditro shows the estimated gross profit that depends on reaching the threshold.
4. Work through what needs attention
The readiness track and the attention panel list what stops the score from being reliable, such as missing records, evidence waiting for review, or inputs nobody has confirmed. Each item links to the screen where you fix it.
5. Check the basis
Select How this is calculated to open the side sheet. It shows how each component was calculated, which ruleset version applied, and which records it used, with Point estimate approval and Period status.
6. Plan the gap
If the estimate is below the threshold, select Plan in the sidebar and propose a plan to close the gap.
Source: https://auditro.co/docs/read-score/